2 Ply Modified Bitumous Membrane, Peel and Stick

5,000 sqft roofing project in Bradford, ON

Dilmar Group ltd. was faced with a challenge in designing a system that was flameless as open flames were not allowed on this site for safety reasons. We installed a 2 ply peel and stick system with hot air welded seams made by Soprema.

Material

2 Ply Modified Bitumous Membrane, Peel and Stick

Location

Bradford, ON

Project Size

5000 sqft.